# E_0241 — Check whether wMSB at the metering location
<span hidden data-pagefind-meta={"title:E_0241 — Check whether wMSB at the metering location · Decision tree · FV 202610"} />

Check whether wMSB at the metering location

| Attribute | Value |
|---|---|
| Designation | Check whether wMSB at the metering location |
| Market role | N/A |
| Regulatory determination / chapter | MaBiS |
| Section | 7.77.1: AD: Initial installation of a iMS in an existing metering location |
| EBD version | — |
| As at | — |

## Decision tree

:::info{title="No decision tree required"}

No decision tree is currently required for this decision, as no response is given.

:::
