Activation of a MaBiS metering point for the daily balancing area aggregate time series from the ÜNB to NB — ÜNB view
The ÜNB activates a MaBiS-ZP of a BG-SZR (category C) and sends the corresponding information to the NB.
Process flow from the perspective of the ÜNB
Process steps
Activation of a MaBiS-ZP for the BG-SZR (category C)
ÜNB NBCheck identifiers
- 55062 — Activation of ZP · AS4
Flow
Message to NB · AS4
Write endpoint
- Transaction updated —
AKTUALISIEREN_PROZESSDATEN
Updates the existing transaction in the backend once the message has been created.
- Transaction updated —
Process information
Wording of the consolidated version, profile ch. 15.2.1, pp. 209–210.
Preconditions
The ÜNB has been informed by the NB responsible for the BG about the assignment of the first market location with ÜNB aggregation responsibility, for whose assigned combination of ZRT, voltage level and BG no MaBiS-ZP for the BG-SZR (category C) is activated yet.
Results
The NB can assign the BG-SZR (category C) to a MaBiS-ZP.
First message
The party involved on this page sends this itself: “Activation of a MaBiS-ZP for the BG-SZR (category C)” to NB (step 1).
Objective
The ÜNB has activated the MaBiS-ZP for the corresponding BG-SZR (category C) at the NB.
Other views of the process
The same process through the eyes of the other parties involved: the same steps, each read from their point of view.
- View NB — NB
Notes on this page
The steps are the possible messages of this process, not a sequence — the source lists neither conditions nor alternatives. The small box on the step names the own view on the left: with ← it receives, with → it sends. Collapsed steps run between other market partners.
The source does not yet name the event that triggers these steps.
Applies to: 1
For this market role there is no write catalog; the step therefore shows only the command of the write call, without address and without button.
Applies to: 1