Electricity processes
Processes
Electricity processes
Choose your market role. For every process you see the steps from your perspective, the messages with their check identifiers and the decision trees. Covered are GPKE, WiM electricity, MaBiS, Redispatch and the application guides.
Format version
Further market roles
The processes of ÜNB, BIKO, BKV and ESA. The MACO APP does not serve these market roles as a product.
LFSupplier · 98 processes
GPKE Part 222 processes
- Billing of another service (GPKE Part 2)
- Billing data balancing group settlement
- Billing data grid usage settlement
- Start of the replacement supply / default supply
- Order placement of a change of billing data from LF to NB
- Determination of the MaLo-ID of the market location
- Case 1: LF assignment for … without DV obligation
- Case 2: LF assignment for EEG market location with DV obligation
- Case 3: LF assignment for … mapped
- Case 4: LF assignment for … mapped
- Contract termination (GPKE Teil 2)
- Start of supply (GPKE Teil 2)
- End of supply from LF to NB (GPKE Teil 2)
- End of supply from NB to LF (GPKE Teil 2)
- Grid usage settlement
- Creation
- Cancelling the interruption and … instruction of the LF
- Interruption of grid connection use … LF (GPKE Teil 2)
- Restoration of the … LF (GPKE Teil 2)
- Transmission of price sheet NB to LF (GPKE Part 2)
- Transmission of the previously measured … (GPKE Part 2)
- Transmission of the delivery note for the grid usage settlement
GPKE Part 321 processes
- Billing of price sheet services … between MSB and LF
- Termination of a configuration by the MSB
- Order placement to terminate a configuration from LF to MSB
- Order placement to terminate a … further MSB to MSB
- Order placement of a configuration from LF to MSB
- Order placement of a configuration from LF to NB
- Complaint of the overview of LF definitions from NB to LF
- Complaint of the overview of NB definitions from LF to NB
- Complaint of the overview of … LF from MSB to LF
- Complaint of an LF definition from MSB to LF
- Complaint of an LF definition from NB to LF
- Complaint of an NB definition from LF to NB
- Complaint of a configuration from LF to MSB
- Control command from LF to MSB (UF B016)
- Control command from LF to MSB (UF B024)
- Control command from NB to MSB (UF B016)
- Transmission of MSB price sheet A from MSB to NB and LF
- Transmission of the overview of the … of the LF by the LF
- Transmission of the overview of the … of the NB by the NB
- Transmission of a definition of the LF by the LF
- Transmission of a definition of the NB by the NB
GPKE Part 410 processes
- Order placement for master data change to LF (responsible)
- Order placement for master data change to MSB (responsible)
- Order placement for master data change to NB (responsible)
- Order placement for master data change to ÜNB (responsible)
- Business data request
- Master data change from the LF … (GPKE Teil 4)
- Master data change from the MSB … (GPKE Teil 4)
- Master data change from the NB … (GPKE Teil 4)
- Master data change initiated by the ÜNB (responsible)
- Transmission of information
WiM Electricity Part 110 processes
- Billing of metering point operation to the LF
- Request for invoice processing of … the LF by the LF
- Quotation for invoice processing of … LF by the MSB
- Termination of invoice processing of … LF by the MSB
- Termination of invoice processing of … the LF by the LF
- Start of metering point operation
- Initial installation of an mME in an existing metering location
- Initial installation of an iMS in an existing metering location
- Metering location change from LF to MSB (WiM Strom Teil 1)
- Transmission of price sheet MSB to LF
WiM Electricity Part 29 processes
- Request for value from LF
- Processing and transmission of … of the market location
- Complaint from LF
- Cancellation of values from the MSB of the market location
- Cancellation of meter readings from the LF
- Fault rectification in the metering location (WiM Strom Teil 2)
- Transmission of the calculation formula
- Transmission of values per type 2 from MSB to NB or LF
- Transmission of meter readings from LF
MaBiS21 processes
- Activation of MaBiS-ZP for … work aggregated time series
- Activation of MaBiS metering point … from NB to LF
- Activation of MaBiS metering point … from ÜNB to LF
- Request for the supplier substitute ene … a subscription
- Exchange of the supplier substitute energy clearing list
- Exchange of the supplier clearing list … (incl. subscription)
- Exchange of the supplier clearing list … (incl. subscription)
- Termination of the subscription to the … work clearing list
- Termination of subscription for the … from LF to NB
- Termination of subscription for the … from LF to ÜNB
- Termination of a subscription from … LF or ÜNB to NB
- Deactivation of MaBiS-ZP for … work aggregated time series
- Deactivation of MaBiS metering point … from NB to LF
- Deactivation of MaBiS metering point … from ÜNB to LF
- Start of a subscription from … LF or ÜNB to NB
- Transmission of the supplier curtailed energy aggregated time series
- Transmission of the supplier aggregated time series from NB to LF
- Transmission of the supplier aggregated time series from ÜNB to LF
- Transmission of the list of … NB to LF or ÜNB
- Transmission of the monthly … per market location
- Transmission of standardized profiles … NB to LF or ÜNB
Processes for the determination and billing of excess/shortfall volumes for electricity and gas1 process
AWH Model 2 Charging-Event-Specific Balancing Energy Allocation Option1 process
AWH Processes for Changing the Technology at Locations3 processes
NBGrid operator · 158 processes
GPKE Part 223 processes
- Billing of another service (GPKE Part 2)
- Billing data balancing group settlement
- Billing data grid usage settlement
- Start of the replacement supply / default supply
- Order placement of a change of billing data from LF to NB
- Order placement of a change of … from ÜNB to NB
- Determination of the MaLo-ID of the market location
- Case 1: LF assignment for … without DV obligation
- Case 2: LF assignment for EEG market location with DV obligation
- Case 3: LF assignment for … mapped
- Case 4: LF assignment for … mapped
- Start of supply (GPKE Teil 2)
- End of supply from LF to NB (GPKE Teil 2)
- End of supply from NB to LF (GPKE Teil 2)
- Grid usage settlement
- Creation
- Cancelling the interruption and … instruction of the LF
- Interruption of grid connection use … LF (GPKE Teil 2)
- Restoration of the … (GPKE Teil 2)
- Restoration of the … LF (GPKE Teil 2)
- Transmission of price sheet NB to LF (GPKE Part 2)
- Transmission of the previously measured … (GPKE Part 2)
- Transmission of the delivery note for the grid usage settlement
GPKE Part 321 processes
- Billing of price sheet services … between MSB and NB
- Termination of a configuration by the MSB
- Order placement to terminate a configuration from NB to MSB
- Order placement to terminate a … further MSB to MSB
- Order placement of a configuration from LF to NB
- Order placement of a configuration from NB to MSB
- Setup of the configurations … or tranche
- Complaint of the overview of LF definitions from NB to LF
- Complaint of the overview of NB definitions from LF to NB
- Complaint of the overview of … NB from MSB to NB
- Complaint of an LF definition from NB to LF
- Complaint of an NB definition from LF to NB
- Complaint of an NB definition from MSB to NB
- Complaint of a configuration from NB to MSB
- Control command from LF to MSB (UF B024)
- Control command from NB to MSB (UF B016)
- Transmission of MSB price sheet A from MSB to NB and LF
- Transmission of the overview of the … of the LF by the LF
- Transmission of the overview of the … of the NB by the NB
- Transmission of a definition of the LF by the LF
- Transmission of a definition of the NB by the NB
GPKE Part 411 processes
- Order placement for master data change to LF (responsible)
- Order placement for master data change to MSB (responsible)
- Order placement for master data change to NB (responsible)
- Order placement for master data change to ÜNB (responsible)
- Business data request
- Master data on balancing group integrity
- Master data change from the LF … (GPKE Teil 4)
- Master data change from the MSB … (GPKE Teil 4)
- Master data change from the NB … (GPKE Teil 4)
- Master data change initiated by the ÜNB (responsible)
- Transmission of information (GPKE Part 4)
WiM Electricity Part 17 processes
- Billing of metering point operation with iMS to the NB
- Start of metering point operation (WiM Electricity Part 1)
- End of metering point operation
- Initial installation of an iMS in an existing metering location
- Metering location change from NB to MSB (WiM Strom Teil 1)
- gMSB obligation (WiM Strom Teil 1)
- Transmission of price sheet … NB“ from MSB to NB
WiM Electricity Part 29 processes
- Request for value from NB
- Processing and transmission of … of the market location
- Complaint from NB
- Cancellation of values from the MSB of the market location
- Cancellation of meter readings from the NB
- Fault rectification in the metering location (WiM Strom Teil 2)
- Transmission of the calculation formula
- Transmission of values per type 2 from MSB to NB or LF
- Transmission of meter readings from NB
MaBiS68 processes
- Reconciliation of the grid time series
- Activation of an allocation authorization of the BKV at the NB
- Activation of MaBiS-ZP for … NB and BKV (anfNB)
- Activation of MaBiS-ZP for … NB and BKV (of the LF)
- Activation of MaBiS-ZP for … work aggregated time series
- Activation of a MaBiS metering point for the grid time series
- Activation of MaBiS metering point … NB to BIKO and BKV
- Activation of MaBiS metering point … time series (AAÜZ)
- Activation of MaBiS metering point … from BIKO to NB
- Activation of MaBiS metering point … from NB to LF
- Activation of MaBiS metering point … from ÜNB to NB
- Activation of MaBiS metering point … ÜNB to BIKO and NB
- Activation of MaBiS metering point … ÜNB to BIKO and NB
- Request for the supplier substitute ene … a subscription
- Request and transmission of the … BIKO and NB
- Request and transmission … between NB and BKV
- Exchange of delta time series carry-over list from ÜNB to NB
- Exchange of the supplier substitute energy clearing list
- Exchange of the supplier clearing list … (incl. subscription)
- Termination of the subscription to the … work clearing list
- Termination of subscription for the … from LF to NB
- Termination of subscription for the … from NB to ÜNB
- Termination of subscription for … from BKV to NB
- Termination of a subscription from … LF or ÜNB to NB
- Deactivation of an allocation authorization of the BKV at the NB
- Deactivation of MaBiS-ZP for … NB and BKV (anfNB)
- Deactivation of MaBiS-ZP for … NB and BKV (of the LF)
- Deactivation of MaBiS-ZP for … work aggregated time series
- Deactivation of MaBiS-ZP for … from ÜNB to NB
- Deactivation of a MaBiS metering point for the grid time series
- Deactivation of MaBiS metering point … NB to BIKO and BKV
- Deactivation of MaBiS metering point … time series (AAÜZ)
- Deactivation of MaBiS metering point … from NB to LF
- Deactivation of MaBiS metering point … from BIKO to NB
- Deactivation of MaBiS metering point … ÜNB to BIKO and NB
- Deactivation of MaBiS metering point … ÜNB to BIKO and NB
- Start of a subscription from … LF or ÜNB to NB
- UF MaBiS_006 Transmission of grid load time series
- Transfer of curtailed energy from the EEG-BK of the NB to the ÜNB
- Transmission of balancing area clear … (incl. subscription)
- Transmission of the data status of the grid time series
- Transmission of the data status of the … BIKO to ÜNB and NB
- Transmission of the data status for the … BIKO to NB and BKV
- Transmission of data status for the … BIKO to ÜNB and NB
- Transmission of data status for the … NB and BKV (anfNB)
- Transmission of data status for the … time series (AAÜZ)
- Transmission of grid load time series
- Transmission of validation notification of the … NB via BIKO to ÜNB
- Transmission of validation notification for the … BKV (anfNB) and NB
- Transmission of validation notification for the … BKV to BIKO and NB
- Transmission of validation notification for the … aggregate time series to ÜNB
- Transmission of validation notification for the … time series (AAÜZ)
- Transmission of the settlement aggregate time … from BIKO to NB
- Transmission of the balancing area aggregate time series from ÜNB
- Transmission of the balance group aggregate time … NB to BIKO and BKV
- Transmission of the supplier curtailed energy aggregated time series
- Transmission of the supplier aggregated time series from NB to LF
- Transmission of the list of profile definitions from NB to MSB
- Transmission of the list of … NB to LF or ÜNB
- Transmission of the grid time series
- Transmission of the monthly … ANB and BKV (anfNB)
- Transmission of the monthly … per market location
- Transmission of the monthly … time series (AAÜZ)
- Transmission of the daily … time series (AAÜZ)
- Transmission of the daily … from ÜNB to NB
- Transmission of the delta time series transfer … ÜNB to BIKO and NB
- Transmission of standardized profiles from NB to MSB
- Transmission of standardized profiles … NB to LF or ÜNB
Redispatch Communication Processes5 processes
Business Processes for EEG Transfer Time Series V1.01 process
Processes for the determination and billing of excess/shortfall volumes for electricity and gas1 process
AWH Supplement to the Market Rules for the Implementation of Balancing Group Settlement Electricity (MaBiS)2 processes
AWH Model 2 Charging-Event-Specific Balancing Energy Allocation Option5 processes
AWH Grid Operator Change2 processes
AWH Processes for Changing the Technology at Locations3 processes
MSBMetering point operator · 87 processes
GPKE Part 25 processes
GPKE Part 324 processes
- Billing of price sheet services … between MSB and LF
- Billing of price sheet services … between MSB and NB
- Termination of a configuration by the MSB
- Order placement to terminate a configuration from LF to MSB
- Order placement to terminate a configuration from NB to MSB
- Order placement to terminate a … further MSB to MSB
- Order placement of a configuration from LF to MSB
- Order placement of a configuration from NB to MSB
- Setup of the configurations … or tranche
- Complaint of the overview of … LF from MSB to LF
- Complaint of the overview of … NB from MSB to NB
- Complaint of an LF definition from MSB to LF
- Complaint of an NB definition from MSB to NB
- Complaint of a configuration from LF to MSB
- Complaint of a configuration from MSB
- Complaint of a configuration from NB to MSB
- Control command from LF to MSB (UF B016)
- Control command from LF to MSB (UF B024)
- Control command from NB to MSB (UF B016)
- Transmission of MSB price sheet A from MSB to NB and LF
- Transmission of the overview of the … of the LF by the LF
- Transmission of the overview of the … of the NB by the NB
- Transmission of a definition of the LF by the LF
- Transmission of a definition of the NB by the NB
GPKE Part 49 processes
- Order placement for master data change to LF (responsible)
- Order placement for master data change to MSB (responsible)
- Order placement for master data change to NB (responsible)
- Order placement for master data change to ÜNB (responsible)
- Business data request
- Master data change from the LF … (GPKE Teil 4)
- Master data change from the MSB … (GPKE Teil 4)
- Master data change from the NB … (GPKE Teil 4)
- Master data change initiated by the ÜNB (responsible)
WiM Electricity Part 119 processes
- Billing of metering point operation to the LF
- Billing of metering point operation with iMS to the NB
- Billing of services
- Request for invoice processing of … the LF by the LF
- Quotation for invoice processing of … LF by the MSB
- Termination of invoice processing of … LF by the MSB
- Termination of invoice processing of … the LF by the LF
- Start of metering point operation (WiM Electricity Part 1)
- End of metering point operation
- Initial installation of an mME in an existing metering location
- Initial installation of an iMS in an existing metering location
- Device replacement (WiM Strom Teil 1)
- Device takeover (WiM Strom Teil 1)
- Contract termination of metering point operation (WiM Strom Teil 1)
- Metering location change from LF to MSB (WiM Strom Teil 1)
- Metering location change from NB to MSB (WiM Strom Teil 1)
- gMSB obligation
- Transmission of price sheet MSB to LF
- Transmission of price sheet … NB“ from MSB to NB
WiM Electricity Part 223 processes
- Billing of a service rendered for the ESA
- Request for value from LF
- Request for value from MSB of the market location
- Request for value from NB
- Request and order placement of values by the ESA
- Processing and transmission of … of the market location
- Processing and transmission of … of the metering location
- Termination of transmission of values to ESA by ESA
- Termination of transmission of values to ESA by MSB
- MSB of market location identifies need for complaint itself
- Complaint from LF
- Complaint from NB
- Complaint from ÜNB
- Cancellation of values from the MSB of the market location
- Cancellation of values from the MSB of the metering location
- Cancellation of meter readings from the LF
- Cancellation of meter readings from the NB
- Fault rectification in the metering location
- Transmission of the calculation formula
- Transmission of values per type 2 from MSB to NB or LF
- Transmission of values from MSB to ESA
- Transmission of meter readings from LF
- Transmission of meter readings from NB
MaBiS2 processes
AWH Processes for Changing the Technology at Locations5 processes
BIKOBalancing coordinator · 49 processes
MaBiS48 processes
- Activation of MaBiS-ZP for … NB and BKV (anfNB)
- Activation of MaBiS-ZP for … NB and BKV (of the LF)
- Activation of a MaBiS metering point for the grid time series
- Activation of MaBiS metering point … NB to BIKO and BKV
- Activation of MaBiS metering point … from BIKO to BKV
- Activation of MaBiS metering point … from BIKO to NB
- Activation of MaBiS metering point … from BIKO to ÜNB
- Activation of MaBiS metering point … ÜNB to BIKO and BKV
- Activation of MaBiS metering point … ÜNB to BIKO and NB
- Activation of MaBiS metering point … ÜNB to BIKO and NB
- Request and transmission of the … BIKO and NB
- Request and transmission of the … BIKO and ÜNB
- Request and transmission of the … BKV and BIKO
- Deactivation of MaBiS-ZP for … NB and BKV (anfNB)
- Deactivation of MaBiS-ZP for … NB and BKV (of the LF)
- Deactivation of a MaBiS metering point for the grid time series
- Deactivation of MaBiS metering point … NB to BIKO and BKV
- Deactivation of MaBiS metering point … from BIKO to BKV
- Deactivation of MaBiS metering point … from BIKO to ÜNB
- Deactivation of MaBiS metering point … from BIKO to NB
- Deactivation of MaBiS metering point … ÜNB to BIKO and BKV
- Deactivation of MaBiS metering point … ÜNB to BIKO and NB
- Deactivation of MaBiS metering point … ÜNB to BIKO and NB
- Transfer of curtailed energy from the EEG-BK of the NB to the ÜNB
- Transmission of imbalance energy price
- Transmission of the data status of the grid time series
- Transmission of the data status of the … BIKO to ÜNB and NB
- Transmission of the data status for the … BIKO to NB and BKV
- Transmission of data status for the … BIKO to ÜNB and BKV
- Transmission of data status for the … BIKO to ÜNB and NB
- Transmission of data status for the … NB and BKV (anfNB)
- Transmission of data status for the … time series (AAÜZ)
- Transmission of validation notification of the … NB via BIKO to ÜNB
- Transmission of validation notification for the … BKV (anfNB) and NB
- Transmission of validation notification for the … BKV to BIKO and NB
- Transmission of validation notification for the … BKV to BIKO and ÜNB
- Transmission of validation notification for the … aggregate time series to ÜNB
- Transmission of validation notification for the … time series (AAÜZ)
- Transmission of the settlement aggregate time … from BIKO to BKV
- Transmission of the settlement aggregate time … from BIKO to NB
- Transmission of the settlement aggregate time … from BIKO to ÜNB
- Transmission of the balancing area aggregate time series from ÜNB
- Transmission of the balance group aggregate time … NB to BIKO and BKV
- Transmission of the balance group aggregate time … ÜNB to BIKO and BKV
- Transmission of the grid time series
- Transmission of the monthly … ANB and BKV (anfNB)
- Transmission of the monthly … time series (AAÜZ)
- Transmission of the delta time series transfer … ÜNB to BIKO and NB
Business Processes for EEG Transfer Time Series V1.01 process
BKVBalance responsible party · 38 processes
MaBiS37 processes
- Order cancellation of the aggregation level … control area level
- Activation of an allocation authorization of the BKV at the NB
- Activation of MaBiS-ZP for … NB and BKV (anfNB)
- Activation of MaBiS-ZP for … NB and BKV (of the LF)
- Activation of MaBiS metering point … NB to BIKO and BKV
- Activation of MaBiS metering point … from BIKO to BKV
- Activation of MaBiS metering point … from ÜNB to BKV
- Activation of MaBiS metering point … ÜNB to BIKO and BKV
- Request and transmission of the … BKV and BIKO
- Request and transmission … between NB and BKV
- Request and transmission … ÜNB and BKV
- Termination of subscription for the … from BKV to ÜNB
- Termination of subscription for … from BKV to NB
- Order placement of the aggregation level of the … level of the control area
- Deactivation of an allocation authorization of the BKV at the NB
- Deactivation of MaBiS-ZP for … NB and BKV (anfNB)
- Deactivation of MaBiS-ZP for … NB and BKV (of the LF)
- Deactivation of MaBiS-ZP for … from ÜNB to BKV
- Deactivation of MaBiS metering point … NB to BIKO and BKV
- Deactivation of MaBiS metering point … from BIKO to BKV
- Deactivation of MaBiS metering point … ÜNB to BIKO and BKV
- Transfer of curtailed energy from the EEG-BK of the NB to the ÜNB
- Transmission of imbalance energy price
- Transmission of the data status for the … BIKO to NB and BKV
- Transmission of data status for the … BIKO to ÜNB and BKV
- Transmission of data status for the … NB and BKV (anfNB)
- Transmission of data status for the … time series (AAÜZ)
- Transmission of validation notification for the … BKV (anfNB) and NB
- Transmission of validation notification for the … BKV to BIKO and NB
- Transmission of validation notification for the … BKV to BIKO and ÜNB
- Transmission of validation notification for the … time series (AAÜZ)
- Transmission of the settlement aggregate time … from BIKO to BKV
- Transmission of the balance group aggregate time … NB to BIKO and BKV
- Transmission of the balance group aggregate time … ÜNB to BIKO and BKV
- Transmission of the monthly … ANB and BKV (anfNB)
- Transmission of the monthly … time series (AAÜZ)
- Transmission of the daily … from ÜNB to BKV
Business Processes for EEG Transfer Time Series V1.01 process
ESAEnergy service provider · 5 processes
ÜNBTransmission system operator · 67 processes
GPKE Part 25 processes
GPKE Part 32 processes
GPKE Part 49 processes
- Order placement for master data change to LF (responsible)
- Order placement for master data change to MSB (responsible)
- Order placement for master data change to NB (responsible)
- Order placement for master data change to ÜNB (responsible)
- Master data on balancing group integrity
- Master data change initiated by the LF (responsible)
- Master data change initiated by the MSB (responsible)
- Master data change initiated by the NB (responsible)
- Master data change initiated by the ÜNB (responsible)
WiM Electricity Part 24 processes
MaBiS42 processes
- Order cancellation of the aggregation level … control area level
- Activation of MaBiS metering point … time series (AAÜZ)
- Activation of MaBiS metering point … from BIKO to ÜNB
- Activation of MaBiS metering point … from ÜNB to BKV
- Activation of MaBiS metering point … from ÜNB to LF
- Activation of MaBiS metering point … from ÜNB to NB
- Activation of MaBiS metering point … ÜNB to BIKO and BKV
- Activation of MaBiS metering point … ÜNB to BIKO and NB
- Activation of MaBiS metering point … ÜNB to BIKO and NB
- Request and transmission of the … BIKO and ÜNB
- Request and transmission … ÜNB and BKV
- Exchange of delta time series carry-over list from ÜNB to NB
- Exchange of the supplier clearing list … (incl. subscription)
- Termination of subscription for the … from BKV to ÜNB
- Termination of subscription for the … from LF to ÜNB
- Termination of subscription for the … from NB to ÜNB
- Order placement of the aggregation level of the … level of the control area
- Deactivation of MaBiS-ZP for … from ÜNB to BKV
- Deactivation of MaBiS-ZP for … from ÜNB to NB
- Deactivation of MaBiS metering point … time series (AAÜZ)
- Deactivation of MaBiS metering point … from BIKO to ÜNB
- Deactivation of MaBiS metering point … from ÜNB to LF
- Deactivation of MaBiS metering point … ÜNB to BIKO and BKV
- Deactivation of MaBiS metering point … ÜNB to BIKO and NB
- Deactivation of MaBiS metering point … ÜNB to BIKO and NB
- Transfer of curtailed energy from the EEG-BK of the NB to the ÜNB
- Transmission of balancing area clear … (incl. subscription)
- Transmission of the data status of the … BIKO to ÜNB and NB
- Transmission of data status for the … BIKO to ÜNB and BKV
- Transmission of data status for the … BIKO to ÜNB and NB
- Transmission of grid load time series
- Transmission of validation notification of the … NB via BIKO to ÜNB
- Transmission of validation notification for the … BKV to BIKO and ÜNB
- Transmission of validation notification for the … aggregate time series to ÜNB
- Transmission of the settlement aggregate time … from BIKO to ÜNB
- Transmission of the balancing area aggregate time series from ÜNB
- Transmission of the balance group aggregate time … ÜNB to BIKO and BKV
- Transmission of the supplier aggregated time series from ÜNB to LF
- Transmission of the daily … time series (AAÜZ)
- Transmission of the daily … from ÜNB to BKV
- Transmission of the daily … from ÜNB to NB
- Transmission of the delta time series transfer … ÜNB to BIKO and NB