Choose your market role. For every process you see the steps from your perspective, the messages with their check identifiers and the decision trees. Covered are GeLi Gas, WiM gas, the disconnection processes and the application guides.
Format version
LFSupplier · 34 processes
GeLi Gas 2.021 processes
- Billing of grid usage
- Request and provision of meter reading values
- Request for calorific value and conversion factor
- Request for master data change from LF to MSB (responsible)
- Request for master data change from LF to NB (responsible)
- Request for master data change from MSB to LF (responsible)
- Request for master data change from MSB to NB (responsible)
- Request for master data change from NB to LF (responsible)
- Request for master data change from NB to MSB (responsible)
- Start of the replacement supply / default supply
- GeLi_Gas 2.0 ch. 1.6.1 Inventory lists
- GeLi_Gas 2.0 ch. 4.1.1.1 Collection of measured values
- Business data request from LF to NB
- Contract termination (GeLi Gas 2.0)
- Start of supply (GeLi Gas 2.0)
- End of supply from LF to NB (GeLi Gas 2.0)
- End of supply from NB to LF (GeLi Gas 2.0)
- Master data change from the LF … (GeLi Gas 2.0)
- Master data change from the MSB … (GeLi Gas 2.0)
- Master data change from the NB … (GeLi Gas 2.0)
- Transmission of the previously measured … (GeLi Gas 2.0)
Processes for the determination and billing of excess/shortfall volumes for electricity and gas4 processes
AWH Disconnection Processes Gas5 processes
- Billing of another service (AWH Disconnection Processes Gas)
- Cancelling the interruption and … on Instruction of the LF
- Interruption of grid connection use … Disconnection processes Gas)
- Restoration of the … Disconnection processes Gas)
- Transmission of price sheet NB to LF (AWH Disconnection Processes Gas)
AWH WiM Gas 2.03 processes
Guideline on market processes for grid operator change1 process
NBGrid operator · 50 processes
GeLi Gas 2.025 processes
- Billing of grid usage
- Request and provision of meter reading values
- Request for calorific value and conversion factor
- Request for master data change from LF to MSB (responsible)
- Request for master data change from LF to NB (responsible)
- Request for master data change from MSB to LF (responsible)
- Request for master data change from MSB to NB (responsible)
- Request for master data change from NB to LF (responsible)
- Request for master data change from NB to MSB (responsible)
- Off-cycle meter reading transmission
- Start of the replacement supply / default supply
- GeLi_Gas 2.0 ch. 1.6.1 Inventory lists
- GeLi_Gas 2.0 ch. 4.1.1.1 Collection of measured values
- Business data request from LF to NB
- Business data request from MSB to NB
- Business data request from NB to MSB
- Start of supply (GeLi Gas 2.0)
- End of supply from LF to NB (GeLi Gas 2.0)
- End of supply from NB to LF (GeLi Gas 2.0)
- Master data change from the LF … (GeLi Gas 2.0)
- Master data change from the MSB … (GeLi Gas 2.0)
- Master data change from the NB … (GeLi Gas 2.0)
- Periodic/regular meter reading transmission
- Transmission of the previously measured … (GeLi Gas 2.0)
- Transmission of information (GeLi Gas 2.0)
Processes for the determination and billing of excess/shortfall volumes for electricity and gas5 processes
Market communication with the gas security platform1 process
Process description for capacity billing at exit points to final consumers1 process
AWH Disconnection Processes Gas6 processes
- Billing of another service (AWH Disconnection Processes Gas)
- Cancelling the interruption and … on Instruction of the LF
- Interruption of grid connection use … Disconnection processes Gas)
- Restoration of the … Disconnection processes Gas)
- Restoration of the … Disconnection processes Gas)
- Transmission of price sheet NB to LF (AWH Disconnection Processes Gas)
AWH WiM Gas 2.010 processes
- Billing of services in metering
- Start of metering point operation (AWH WiM Gas 2.0)
- End of metering point operation from MSB to NB
- End of metering point operation from NB to MSB
- Fault rectification in the metering location (AWH WiM Gas 2.0)
- gMSB obligation (AWH WiM Gas 2.0)
- Transmission of values from LF to NB
- Transmission of values from MSB to NB
- Transmission of values from NB to LF
- Transmission of values from NB to MSB
Guideline on market processes for grid operator change2 processes
MSBMetering point operator · 31 processes
GeLi Gas 2.015 processes
- Request and provision of meter reading values
- Request for master data change from LF to MSB (responsible)
- Request for master data change from LF to NB (responsible)
- Request for master data change from MSB to LF (responsible)
- Request for master data change from MSB to NB (responsible)
- Request for master data change from NB to LF (responsible)
- Request for master data change from NB to MSB (responsible)
- Off-cycle meter reading transmission
- Business data request from MSB to NB
- Business data request from NB to MSB
- Master data change from the LF … (GeLi Gas 2.0)
- Master data change from the MSB … (GeLi Gas 2.0)
- Master data change from the NB … (GeLi Gas 2.0)
- Periodic/regular meter reading transmission
- Transmission of information
AWH Disconnection Processes Gas4 processes
AWH WiM Gas 2.011 processes
- Billing of services in metering
- Start of metering point operation (AWH WiM Gas 2.0)
- End of metering point operation from MSB to NB
- End of metering point operation from NB to MSB
- Device replacement (AWH WiM Gas 2.0)
- Device takeover (AWH WiM Gas 2.0)
- Contract termination of metering point operation (AWH WiM Gas 2.0)
- Fault rectification in the metering location
- gMSB obligation
- Transmission of values from MSB to NB
- Transmission of values from NB to MSB