Transmission of values (load curve) from NB to MGV — NB view
Process flow from the perspective of the NB
Process steps
Values (load curve)
NB MGVCheck identifiers
- 13008 — Load curve (gas) · AS4
Flow
Prozessauslöser
START_ERHEBUNG_MESSWERTEThe backend triggers this step with this event.
Message to MGV · AS4
Write endpoint
- Transaction updated — Update process data
POST /updateProcessData
Updates the existing transaction in the backend once the message has been created.
- Transaction updated — Update process data
Process information
Notes on this page
The source provides no use case profile for this process — objective, precondition and result are not recorded there.
The steps are the possible messages of this process, not a sequence — the source lists neither conditions nor alternatives. The small box on the step names the own view on the left: with ← it receives, with → it sends. Collapsed steps run between other market partners.
Step sequence reconstructed
For this process, the BNetzA consolidated version carries no sequence diagram. The steps are reconstructed from the BDEW check identifier table: grouped by the designation, ordered by the process step. The method agrees with the consolidated version in 200 of 200 cases that can be cross-checked — the individual line is nevertheless not editorially reviewed. Check it against the rulebook before adopting it into an implementation specification.