Activation of a MaBiS metering point for the daily curtailed energy transfer time series (AAÜZ) — ANB view
The ANB activates a MaBiS-ZP for the daily AAÜZ and sends the corresponding information to the ÜNB.
Process flow from the perspective of the NB (ANB)
Process steps
Activation of a MaBiS-ZP for the daily AAÜZ
NB (ANB) ÜNBCheck identifiers
- 55197 — Activation ZP daily AAÜZ · AS4
Flow
Message to ÜNB · AS4
Write endpoint
- Transaction updated — Update process data
POST /updateProcessData
Updates the existing transaction in the backend once the message has been created.
- Transaction updated — Update process data
Process information
Wording of the consolidated version, profile ch. 17.2.1.1, pp. 227–228.
Preconditions
- The ANB has assigned to the BKV the first market location with possible redispatch measures, a combination of BK, BG and BKV, for which no MaBiS-ZP for the daily AAÜZ is activated yet.
Results
- The ÜNB can assign the daily AAÜZ to this MaBiS-ZP.
- In the error case, the ÜNB can initiate the clearing process with the NB.
First message
The party involved on this page sends this itself: “Activation of a MaBiS-ZP for the daily AAÜZ” to ÜNB (step 1).
Objective
The ANB has activated the MaBiS-ZP for the daily curtailed energy transfer time series at the ÜNB.
Other views of the process
The same process through the eyes of the other parties involved: the same steps, each read from their point of view.
- View ÜNB — ÜNB · market role UENB
Notes on this page
The steps are the possible messages of this process, not a sequence — the source lists neither conditions nor alternatives. The small box on the step names the own view on the left: with ← it receives, with → it sends. Collapsed steps run between other market partners.
The source does not yet name the event that triggers these steps.
Applies to: 1
For the check identifiers of these steps there is no test case in the test data set; the »Try it out« button of the write interface therefore offers no body.
Applies to: 1