Transmission of the energy and power values measured so far — LF view
Once the intra-year allocation start of the LF for a market location has been reached, the NB transmits to the LF the energy values of the market location measured up to that intra-year allocation start and the two highest monthly maximum demand values of the current calendar year. Note: if the intra-year allocation start is before 2 February, only one monthly maximum demand value is transmitted for January.
Process flow from the perspective of the LF
Process steps
Energy and demand values measured so far
LF NBZ10Z27Z18Check identifiers
- 13015 — Energy, max. power calendar year before start of supply · AS4
Flow
Message from NB · AS4
APERAK checks
13015→Z10— APERAK check: Is location known ?13015→Z2713015→Z18
Write endpoint
- Transaction created — Create process data
POST /createProcessData
Creates a new transaction in the backend with the data of the incoming message.
- Transaction created — Create process data
Process information
Wording of the consolidated version, profile ch. 3.2.1.1, pp. 82–83.
Preconditions
- This is a consuming market location.
- The LF is the payer of the grid usage.
- Values from MSB are available at NB.
- The intra-year allocation start (via use case „Start of supply“ or „Start of the replacement supply / default supply“) has been reached.
- The grid usage settlement is based on energy price and demand price.
- The information required for the grid usage settlement has been transmitted via the use case „Billing data grid usage settlement“.
Results
A delivery note can be sent.
First message
NB sends “Previously measured energy and demand values” (step 1). From here on, it is the turn of the party involved on this page.
Objective
The LF has the energy values measured at the market location up to its allocation start and the two highest monthly maximum demand values of the market location in the current calendar year.
Other views of the process
The same process through the eyes of the other parties involved: the same steps, each read from their point of view.
- View NB — NB
Notes on this page
The steps are the possible messages of this process, not a sequence — the source lists neither conditions nor alternatives. The small box on the step names the own view on the left: with ← it receives, with → it sends. Collapsed steps run between other market partners.