MSB (55 / 54)
E_0565 — Check result of the order placement (Based on EBD: E_0563_Check result of the instruction)
Check result of the order placement (based on EBD: E_0563_Check result of the instruction)
| Attribute | Value |
|---|---|
| Designation | Check result of the order placement (Based on EBD: E_0563_Check result of the instruction) |
| Market role | MSB |
| Regulatory determination / chapter | GPKE |
| Section | 6.49.2: AD: Control command from LF to MSB |
| EBD version | 4.2 |
| As at | 2026-06-23 |
Decision tree
| Step | Check | Result | Code | Note |
|---|---|---|---|---|
| 10 | Was processing possible in the backend of the MSB? | no | A01 | Backend of the MSB is overloaded. |
| — | — | yes | → Step 20 | — |
| 20 | Was a communication connection to the control box possible? | no | A02 | The communication link to the control box is faulty. |
| — | — | yes | → Step 30 | — |
| 30 | Was it procedurally possible to implement the control command? | no | A03 | Process-wise it is currently not possible to implement the request (e.g. due to maintenance work). |
| — | — | yes | A04 | The control command can in principle be implemented. |
Result codes
| Result code | Cluster | Meaning |
|---|---|---|
A01 | — | Backend of the MSB is overloaded. |
A02 | — | The communication link to the control box is faulty. |
A03 | — | Process-wise it is currently not possible to implement the request (e.g. due to maintenance work). |
A04 | — | The control command can in principle be implemented. |
Notes on this page
Not checked against a process
No consistency check was carried out for this decision tree — no generated BPMN found. Whether the MACO APP implements this tree completely is therefore not evidenced here.