MSB (55 / 54)
E_1001 — Check request (Based on electricity EBD: E_0488_Check request)
Check request (Based on electricity EBD: E_0488_Check request)
| Attribute | Value |
|---|---|
| Designation | Check request (Based on electricity EBD: E_0488_Check request) |
| Market role | MSB |
| Regulatory determination / chapter | Disconnection processes gas |
| Section | 18.2.2: AD: Interruption of grid connection use (disconnect) on the instruction of LF |
| Check identifiers | checked: 17116 · response: 19118, 19119 |
| EBD version | 4.2 |
| As at | 2026-06-23 |
Decision tree
| Step | Check | Result | Code | Note |
|---|---|---|---|---|
| 10 | Has the MSB granted the NB general consent to carry out a reconnection/disconnection? | yes | A01 | Cluster: Consent General consent of the MSB for the disconnection/reconnection is available. |
| — | — | no | → Step 20 | — |
| 20 | Is there a reason preventing a disconnection at the market location? | yes | A02 | Cluster: Rejection There is a reason for prevention. Note: The identified problem must be described/named in the response. |
| — | — | no | → Step 30 | — |
| 30 | Does MSB have technical reasons for a rejection of the disconnection? | yes | A03 | Cluster: Rejection There is a technical reason for rejection. Note: The identified problem must be described/named in the response. |
| — | — | no | → Step 40 | — |
| 40 | Is on-site participation by the MSB in the reconnection/disconnection requested? | yes | A04 | Cluster: consent MSB has consented to the disconnection and reconnection being carried out with the involvement of the MSB. |
| — | — | no | A05 | Cluster: consent MSB has consented to the disconnection and reconnection being carried out by NB. |
Result codes
| Result code | Cluster | Meaning | Response check identifier |
|---|---|---|---|
A01 | Consent | General consent of the MSB for the disconnection/reconnection exists. | 19118 |
A02 | Rejection | A reason for prevention exists. Note: The identified problem must be described/named in the response. | 19119 |
A03 | Rejection | A technical reason for rejection exists. Note: The identified problem must be described/named in the response. | 19119 |
A04 | Consent | MSB has consented to the disconnection and reconnection being carried out with the involvement of the MSB. | 19118 |
A05 | Consent | MSB has consented to the disconnection and reconnection being carried out by NB. | 19118 |
Notes on this page
Role of the numbers: »response« are the check identifiers that list this tree in the ebd_code column of the check identifier table (knowledge-collection · FV 202604); »checked« is the difference set to it from the return path of the process steps. The »response check identifier« column of the result codes assigns a cluster only because this tree carries exactly one checked message and exactly one response per pole; their pole comes from the use case title of the response.
Consistent with the generated process
All 5 result codes of the decision tree are contained in the generated process E_1001.bpmn.