MSB (55 / 54)
E_0233 — Check of self-installation or grandfathering under §19 Abs. 5 MsbG
Check of self-installation or grandfathering under §19 Abs. 5 MsbG
| Attribute | Value |
|---|---|
| Designation | Check of self-installation or grandfathering under §19 Abs. 5 MsbG |
| Market role | MSB |
| Regulatory determination / chapter | MaBiS |
| Section | 7.77.2: AD: Initial installation of a iMS in an existing metering location |
| Check identifiers | Response: 21030, 21031 |
| EBD version | 4.3 |
| As at | — |
Decision tree
| Step | Check | Result | Code | Note |
|---|---|---|---|---|
| 1 | Is there grandfathering pursuant to §19 (5) MsbG for the metering location earmarked for the rollout? | yes | → Step 2 | — |
| — | — | no | → Step 3 | — |
| 2 | Is the grandfathering pursuant to § 19 Abs. 5 MsbG waived for the metering location? | no | A01 | Cluster: Rejection Grandfathering pursuant to § 19 para. 5 MsbG for the metering location |
| — | — | yes | → Step 3 | — |
| 3 | Is self-installation of a iMS or a mME planned? | yes | A02 | Cluster: Rejection Self-installation of a iMS or a mME is planned |
| — | — | no | → Step 4 | — |
| 4 | Is self-installation of a iMS or a mME waived? | yes | A03 | Cluster: Consent Self-installation of a iMS or a mME is waived |
| — | — | no | A04 | Cluster: Rejection No statement regarding self-installation is possible at the present point in time |
Result codes
| Result code | Cluster | Meaning |
|---|---|---|
A01 | Rejection | Legacy protection under § 19 para. 5 MsbG for the metering location |
A02 | Rejection | Self-installation of a iMS or a mME planned |
A03 | Consent | Self-installation of iMS or mME is waived |
A04 | Rejection | No statement possible regarding self-installation at this point in time |
Notes on this page
Role of the numbers: »response« are the check identifiers that list this tree in the ebd_code column of the check identifier table (knowledge-collection · FV 202610); »checked« is the difference set to it from the return path of the process steps.
Not checked against a process
No consistency check was carried out for this decision tree — no generated BPMN found. Whether the MACO APP implements this tree completely is therefore not evidenced here.