NB (69)
E_0544 — Check complaint
Check complaint
| Attribute | Value |
|---|---|
| Designation | Check complaint |
| Market role | NB |
| Regulatory determination / chapter | GPKE |
| Section | 6.38.1: AD: Complaint about the overview of definitions of the NB from LF to NB |
| Check identifiers | Response: 19123 |
| EBD version | 4.2 |
| As at | 2026-06-23 |
Decision tree
| Step | Check | Result | Code | Note |
|---|---|---|---|---|
| 10 | Does the requester complain about a missing overview of the metering time period definition? | yes | → Step 20 | — |
| — | — | no | → Step 30 | — |
| 20 | Was the overview of the metering time period definition sent to the requesting party? | yes | A01 | Overview of the metering time period definition has been sent Note: The business transaction with which the overview of the definition was transmitted must be stated as the reference. |
| — | — | no | End | Send overview of the metering time period definition |
| 30 | Does the requester complain about a missing overview of the switching time definitions? | yes | → Step 40 | — |
| — | — | no | → Step 50 | — |
| 40 | Was the overview of the switching time definitions sent to the requesting party? | yes | A02 | Overview of the switching time definitions has been sent Note: The business transaction with which the overview of the definition was transmitted must be stated as the reference. |
| — | — | no | End | Send overview of the switching time definitions |
| 50 | Does the requester complain about a missing overview of the power curve definitions? | yes | → Step 60 | — |
| — | — | no | → Step 70 | — |
| 60 | Was the overview of the power curve definitions sent to the requesting party? | yes | A03 | Overview of the load curve definitions has been sent Note: The business transaction with which the overview of the definition was transmitted must be stated as the reference. |
| — | — | no | End | Send overview of the load curve definitions |
| 70 | Does the requester complain about an implausible overview of the metering time period definition? | yes | → Step 80 | — |
| — | — | no | → step 90 | — |
| 80 | Is the transmitted overview of the metering time period definition plausible? | yes | A04 | Overview of the metering time period definition is plausible |
| — | — | no | End | Send corrected overview of the metering time period definition |
| 90 | Does the requester complain about an implausible overview of the switching time definitions? | yes | → Step 100 | — |
| — | — | no | → Step 110 | Note: The requester objects to an implausible overview of the load curve definitions |
| 100 | Is the transmitted overview of the switching time definitions plausible? | yes | A05 | Overview of the switching time definitions is plausible |
| — | — | no | End | Send overview of the switching time definitions |
| 110 | Is the transmitted overview of the power curve definitions plausible? | yes | A06 | Overview of the load curve definitions is plausible |
| — | — | no | End | Send overview of the load curve definitions |
Result codes
| Result code | Cluster | Meaning |
|---|---|---|
A01 | — | Overview of the metering time period definition has been sent Note: The business transaction with which the overview of the definition was transmitted must be stated as the reference. |
A02 | — | Overview of the switching time definitions has been sent Note: The business transaction with which the overview of the definition was transmitted must be stated as the reference. |
A03 | — | Overview of the load curve definitions has been sent Note: The business transaction with which the overview of the definition was transmitted must be stated as the reference. |
A04 | — | Overview of the metering time period definition is plausible |
A05 | — | Overview of the switching time definitions is plausible |
A06 | — | Overview of the load curve definitions is plausible |
Notes on this page
Role of the numbers: »response« are the check identifiers that list this tree in the ebd_code column of the check identifier table (knowledge-collection · FV 202604); »checked« is the difference set to it from the return path of the process steps.
Consistent with the generated process
All 6 result codes of the decision tree are contained in the generated process E_0544.bpmn.