NB (69)
E_1005 — Check whether the reconnection order was successful (Based on electricity EBD: E_0499_Check whether the reconnection order was successful)
Check whether the reconnection order was successful (Based on electricity EBD: E_0499_Check whether the reconnection order was successful)
| Attribute | Value |
|---|---|
| Designation | Check whether the reconnection order was successful (Based on electricity EBD: E_0499_Check whether the reconnection order was successful) |
| Market role | NB |
| Regulatory determination / chapter | Disconnection processes gas |
| Section | 18.3.2: AD: Restoration of grid connection use (reconnect) on the instruction of LF |
| Check identifiers | Response: 21039 |
| EBD version | 4.2 |
| As at | 2026-06-23 |
Decision tree
| Step | Check | Result | Code | Note |
|---|---|---|---|---|
| 10 | Has the reconnection been carried out successfully? | yes | A01 | Cluster: successful Market location is reconnected. |
| — | — | no | A02 | Cluster: failed Market location remains disconnected. Note: The reasons for the failure must be transmitted. |
Result codes
| Result code | Cluster | Meaning |
|---|---|---|
A01 | successful | The market location is reconnected. |
A02 | failed | The market location is still disconnected. Note: the reasons for the failure must be transmitted. |
Notes on this page
Role of the numbers: »response« are the check identifiers that list this tree in the ebd_code column of the check identifier table (knowledge-collection · FV 202604); »checked« is the difference set to it from the return path of the process steps.
Not checked against a process
No consistency check was carried out for this decision tree — no generated BPMN found. Whether the MACO APP implements this tree completely is therefore not evidenced here.