NB (69)
E_1006 — Check cancellation (Based on electricity EBD: E_0468_Check cancellation)
Check cancellation (Based on electricity EBD: E_0468_Check cancellation)
| Attribute | Value |
|---|---|
| Designation | Check cancellation (Based on electricity EBD: E_0468_Check cancellation) |
| Market role | NB |
| Regulatory determination / chapter | Disconnection processes gas |
| Section | 17.4.1: AD: Cancellation of the interruption and restoration of grid connection use on the instruction of LF |
| Check identifiers | checked: 39000 · response: 19128, 19129 |
| EBD version | 4.3 |
| As at | — |
Decision tree
| Step | Check | Result | Code | Note |
|---|---|---|---|---|
| 10 | Has the disconnection/reconnection order already been rejected by the NB? | yes | A06 | Cluster: Rejection Order has already been rejected and can no longer be cancelled |
| — | — | no | → Step 20 | — |
| 20 | Is this a cancellation of a reconnection order? | yes | → Step 30 | — |
| — | — | no | → Step 40 | Note: This is a cancellation of a disconnection order. |
| 30 | Was the cancellation received before the reconnection was carried out? | yes | A01 | Cluster: Consent Reconnection order is cancelled. |
| — | — | no | A02 | Cluster: Rejection Cancellation of the reconnection order is no longer possible. |
| 40 | Was the cancellation message received no later than the day before the execution date planned by the NB or the fixed disconnection date from the disconnection order? | yes | A03 | Cluster: Consent Disconnection order is cancelled up to the day before the disconnection. |
| — | — | no | → Step 50 | — |
| 50 | Was the cancellation received before the disconnection was carried out? | yes | A04 | Cluster: Consent Disconnection order is cancelled on the day of the disconnection. |
| — | — | no | A05 | Cluster: Rejection Cancellation of the disconnection order is no longer possible. |
Result codes
| Result code | Cluster | Meaning | Response check identifier |
|---|---|---|---|
A06 | Rejection | Order has already been rejected and can no longer be cancelled | 19129 |
A01 | Consent | Reconnection order is canceled. | 19128 |
A02 | Rejection | Cancellation of the reconnection order is no longer possible. | 19129 |
A03 | Consent | Disconnection order is cancelled up to the day before the disconnection. | 19128 |
A04 | Consent | Disconnection order is cancelled on the day of the disconnection. | 19128 |
A05 | Rejection | Cancellation of the disconnection order is no longer possible. | 19129 |
Notes on this page
Role of the numbers: »response« are the check identifiers that list this tree in the ebd_code column of the check identifier table (knowledge-collection · FV 202610); »checked« is the difference set to it from the return path of the process steps. The »response check identifier« column of the result codes assigns a cluster only because this tree carries exactly one checked message and exactly one response per pole; their pole comes from the use case title of the response.
Consistent with the generated process
All 6 result codes of the decision tree are contained in the generated process E_1006.bpmn.